Who gave Alan the power tools.
The overboarding going down upstairs |
 |
The overboarding is complete |
 |
The new laminate flooring going down |
| |
 |
Under the floor goes all the pipework for the bathroom and the wiring |
 |
The fresh water tank, wrapped with insulation ready for fitting |
 |
The fresh water tank fits into the cavity under the top back seat of the bus |
| |
 |
Framework for seating area ready to be fitted |
 |
Framework for seating in all its glory |
 |
Just to show what the seat base and backs will look like when its finished |
| |
 |
Floor framework on the central door side and the doors are finally boarded over |
 |
Looks like chaos but its getting there |
 |
Boiler, cooker, fridge and cooker hood are in place |